TM-9-2350-311-20-2

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR CAB, ARMAMENT, SIGHTING AND FIRE CONTROL, ELEVATING AND TRAVERSING SYSTEMS AND ASSOCIATED COMPONENTS

DECEMBER 1993

  TM-9-2350-311-20-2 - Page 320 of 828

TM 9–2350–311–20–2
6–4
6–1
GAGE ASSEMBLY, SIGHT — CONTINUED
NOTE
If plug is not available to plug tube, reservoir must be drained (para 6–3) prior to disconnecting tube.
2
Disconnect bent metallic tube (4) from sight gage (1) by unscrewing coupling nut (5). Install plug (2) to pre-
vent hydraulic fluid from draining.
NOTE
Step 3 only pertains to M109A4/M109A5 howitzers.
3
Loosen two hose clamps (6) and disconnect bent metallic tube (7) from top of sight gage (1). Remove hose
clamps and 2-inch hose (8).
4
Remove machine bolt (9) and lockwasher (10) from top of sight gage (1) and cap screw (11) near bottom
and remove sight gage from power pack assembly (12).
M109A2/M109A3 HOWITZER
9
1
4
5
12
11
2
10
M109A4/M109A5 HOWITZER
1
2
4
5
6
8
6
7
9
12
11
10


Back to Top