TM-9-2350-311-20-2

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR CAB, ARMAMENT, SIGHTING AND FIRE CONTROL, ELEVATING AND TRAVERSING SYSTEMS AND ASSOCIATED COMPONENTS

DECEMBER 1993

  TM-9-2350-311-20-2 - Page 328 of 828

TM 9–2350–311–20–2
6–12
6–3
POWER PACK, HYDRAULIC (DRAINING, FILLING AND CHARGING) — CONTINUED
c.
Filling
1
Fill power pack reservoir with hydraulic fluid at power pack gage opening (17) (para 2–9).
2
Check power pack gage (18) for fluid level. Fill to FULL AT 0 PRESSURE mark (19). If power pack reservoir
is overfilled, go to step 3.
3
Loosen plug (20) at sight gage (21).
4
Turn pointer handle (22) to DRAIN position.
5
Check fluid level in tube (23) on sight gage (21). When fluid level reaches FULL AT 0 PRESSURE mark
(19), turn pointer handle (22) to GAGE position and tighten plug (20).
18
19
23
17
22
21
20
25


Back to Top