TM 9–2350–311–20–2
8–42
Change 2
8–9
NBC POWER LEAD ASSEMBLY
This task covers:
a.
Removal
b.
Disassembly/Assembly
c.
Testing
d.
Installation
INITIAL SETUP
Applicable Configuration
M109A4/M109A5 howitzers
Test Equipment
Multimeter (item 6, Appx H)
Tools
Artillery and turret mechanic’s tool kit
(SC 5180–95–CL–A12)
Equipment Condition
Disconnect batteries (TM 9–2350–311–20–1)
SECTION
CHIEF’S
HEATER
CANNONEER NO. 1’S
HEATER
GUNNER’S
HEATER
ASSISTANT
GUNNER’S
HEATER
NBC
POWER
LEAD
ASSEMBLY
NBC CONTROL
BOX ASSEMBLY
POWER
RELAY BOX
ASSEMBLY
M2A2 AIR PURIFIER
WIRE 136
WIRE 135
WIRE 136D
WIRE 136B
WIRE 136C