TM-9-2350-311-20-2

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR CAB, ARMAMENT, SIGHTING AND FIRE CONTROL, ELEVATING AND TRAVERSING SYSTEMS AND ASSOCIATED COMPONENTS

DECEMBER 1993

  TM-9-2350-311-20-2 - Page 471 of 828

TM 9–2350–311–20–2
8–47
Section II.
COMPONENT MAINTENANCE
8–11 DOME LIGHT ASSEMBLIES
This task covers:
a.
Removal
b.
Disassembly
c.
Assembly
d.
Installation
INITIAL SETUP
Tools
Artillery and turret mechanic’s tool kit
(SC 5180–95–CL–A12)
Materials/Parts
Gasket (item 174, Appx G)
Gasket (item 168, Appx G)
Lockwashers (5) (item 61, Appx G)
Preformed packing (item 177, Appx G)
Seal (item 176, Appx G)
Seal (item 178, Appx G)
Equipment Condition
Disconnect batteries (TM 9–2350–311–10)
a.
Removal
WARNING
Make sure that CAB POWER and MASTER switches are fully operational. Turn them off when work-
ing on cab electrical components. Failure to observe this warning could result in injury or death.
1
Disconnect wire 138, from connector (1) on dome light assembly (2).
2
Remove four cap screws (3), four flat washers (4), and dome light assembly (2).
1
3
4
2


Back to Top