TM 9–2350–311–20–2
8–40
Change 2
8–8
GUNNER’S ELEVATION CONTROL SWITCH LEAD ASSEMBLY — CONTINUED
a.
Removal — Continued
3
Remove three self-locking nuts (5), three flat washers (6), three cap screws (7), three flat washers (8), and
three plastic attaching straps (9). Discard self-locking nuts.
4
Remove three cap screws (10), three lockwashers (11), three flat washers (12), and three plastic attaching
straps (13) from three hex nuts (14) welded to cab. Discard lockwashers.
5
Remove wire 623 from wiring bundle.
7
8
9
6
5
10
11
13
12
14