TM 9–2350–311–20–2
8–60
Change 2
8–13 POWER RELAY BOX ASSEMBLY
This task covers:
a.
Removal
b.
Disassembly
c.
Assembly
d.
Installation
INITIAL SETUP
Tools
Artillery and turret mechanic’s tool kit
(SC 5180–95–CL–A12)
Materials/Parts
Gasket (item 101, Appx G)
Gasket (item 102, Appx G)
Gasket (item 179, Appx G)
Gaskets (2) (item 103, Appx G)
Lockwasher (item 55, Appx G)
Lockwashers (8) (item 53, Appx G)
Lockwashers (4) (item 54, Appx G)
Lockwashers (2) (item 56, Appx G)
Lockwashers (5) (item 64, Appx G)
Lockwashers (8) (item 76, Appx G)
Lockwashers (6) (item 78, Appx G)
Lockwashers (2) (item 87, Appx G)
Equipment Condition
Disconnect batteries (TM 9–2350–311–20–1)
NBC power switch box removed on M109A4/M109A5
howitzers (para 17–4)
POWER
RELAY BOX
ASSEMBLY
WIRE
100
WIRE
148
WIRE
645
WIRE
104