TM-9-2520-215-34

CROSS-DRIVE TRANSMISSION ASSEMBLY

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

DECEMBER 2005

  TM-9-2520-215-34 - Page 218 of 508

TM 9--2520--215--34
0043 00--4
OUTPUT REDUCTION GEAR PLANETARY CARRIER ASSEMBLY AND
BRAKE HOUSING ASSEMBLY REPLACEMENT – CONTINUED
0043 00
INSTALLATION – Continued
2. Paint shaft threads and top of spacer (11) with white lead. Install nut (2)
3. Place bar (12) between output reduction gear shaft studs. Use torque wrench (item 26, WP 0088 00) and
spanner face wrench socket (item 17, WP 0088 00) to tighten nut (2) to 350 lb--ft (474.6 N
S
m). Continue to
tighten nut (2) until nut (2) locking pin (1) can be installed. If 450 lb--ft (610.2 N
S
m) or more is required, use
different nut (2).
4. Install pin (1) and center nut (2). Use a blunt--end drift to drive center of pin (1) down to approximately 1/16 inch.
If pin (1) remains loose, drive pin (1) 1/32 inch further. Check to ensure cork seal ring (13) (item 34, WP 0087 00)
is in place.


Back to Top