TM 9--2520--215--34
0044 00--5
OUTPUT REDUCTION GEAR PLANETARY CARRIER ASSEMBLY REPAIR –
CONTINUED
0044 00
ASSEMBLY
WARNING
Use gloves or tongs when handling dry ice or chilled parts to prevent injury.
NOTE
Chill new spindles in dry ice for approximately one hour before installation.
1. Install planetary carrier spacer (9), flange end first, into output reduction gear planetary carrier assembly (2).
2
9
2. Lubricate inside diameter of pinion of planetary carrier pinion (5) with oil--soluble grease. Place thrust washer (6)
and thrust washer (7) on one side of planetary carrier pinion (5). Place thrust washer (6) inside planetary carrier
pinion (5).
6
7
5
8
7
6