TM-9-2520-215-34

CROSS-DRIVE TRANSMISSION ASSEMBLY

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

DECEMBER 2005

  TM-9-2520-215-34 - Page 226 of 508

TM 9--2520--215--34
0044 00--6
OUTPUT REDUCTION GEAR PLANETARY CARRIER ASSEMBLY REPAIR –
CONTINUED
0044 00
ASSEMBLY – Continued
3. Insert steel tube into planetary carrier pinion (5) and thrust washer (6).
4. Insert 26 spindle rollers (8) into space between steel tube and planetary carrier pinion (5) bore.
5. Place thrust washer (7), then thrust washer (6) over steel tube. Remove steel tube.
6. Place output reduction gear planetary carrier assembly (2) on press table. Slide planetary carrier pinion (5) and
related parts into location in output reduction gear carrier assembly (2) from which removed. Use steel tube to
align planetary carrier pinion (5), thrust washers and rollers.


Back to Top