INSTALLATION
1.
If removed, install clip (Figure 1, Item 7) on tube assembly (Figure 1, Item 2). Loosely install tube assembly
in adaptor (Figure 1, Item 3).
NOTE
Bolt (Figure 1, Item 6) may already be installed, in right side of flywheel housing, to
accommodate the torque sequence when installing the flywheel housing to the cylinder
block. Remove as required for clip installation.
2.
Install flat washer (Figure 1, Item 4), new lockwasher (Figure 1, Item 5), and bolt (Figure 1, Item 6) through
clip (Figure 1, Item 7). Torque bolt to 30–35 lb-ft (41–47 N·m).
3.
Tighten connection at adaptor (Figure 1, Item 3) and tube assembly (Figure 1, Item 2).
4.
Install oil gauge rod (Figure 1, Item 1) in tube assembly (Figure 1, Item 2).
END OF TASK
END OF WORK PACKAGE