TM9-2815-205-34
(4) Rotate clevis pins (37) in right and left control tube levers (38). Pins must rotate freely.
(5) Check for slight movement of each control tube (15) between its two brackets (39) to ensure
there is no binding.
(6) Rotate each control tube lever (38) to
FULL FUEL position and then release
lever. Control tubes must return to NO
FUEL position.
(7) Remove cotter pin (40) and clevis pin (37)
from opposite control tube lever (38).
Discard cotter pin.
(8) Move speed control lever (1) to FULL
FUEL position (clockwise direction) and
hold with light finger pressure.
4-15