TM-9-2910-226-34

PUMP, FUEL, METERING AND DISTRIBUTING, ASSEMBLY

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT, MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LISTS

JUNE 1974

  TM-9-2910-226-34 - Page 86 of 208

TM 9-2910-226-34
(6) Refer to figure 3-60. Loosen locknuts (B and
D). Remove idle adjustment screw (A) and locknut
(B), high speed adjustment screw (C), and locknut
(D).
NOTE
Sub-paragraph (7) below does not apply to
code A or early code G pumps.
(7) Remove retaining ring (E, fig. 3-60) using
suitable pliers. Remove clamping screw (F) and stop
lever (G).
(8) Refer to figure 3-60. Cut locking wire (H) and
remove four bearing mounting machine screws (J).
Remove and discard four gaskets (K).
NOTE
Code F injection pumps were equipped with
two bearing mounting studs. At
disassembly these should be discarded and
replaced with machine screws.
Figure 3-58. Removing dust cover and operating lever–
two-piece.
Figure 3-60. Removing adjustment screws, stop lever,
operating shaft and associated parts.
Figure 3-59.
Removing dust cover and operating lever–
one-piece.
3-40
NOTE
Paragraphs (9), (10) and (11) do not apply to
code A injection pumps.
(9) Refer to figure 3-61. Remove operating shaft
and bearing (A) and associated parts. Remove and
discard operating shaft bearing gasket (B).


Back to Top