19. Use suitable cutting device on four grommets MS35489-107 (Figure 2-22) and trim off one wide end of grommet
and make even with inside cylinder.
Figure 2-22.
Apron Hose Grommet.
20. Use RTV sealant (Chapter 1, 1-8) or suitable sealant to install trimmed ends of grommets into two holes (Figure
2-10) from both sides.
SECTION VII
INSTALLATION PROCEDURES FOR HBF-TT SYSTEM
1.
Install fittings on valves and track and blade manifold as follows:
a.
Install two flow valves FCCB LAV (2.0 GPM) (Figure 2-23, 5) to valve bodies GAI/S (1).
Figure 2-23.
Valve Fittings (1 of 2).
b.
Install two valves CWCG-LGN (4) next to port 4 and vented check valves CVCV XCN (3) and to valve bodies
XP1/S (2).
TRIMMED EDGE
BEFORE TRIMMING
5
1
1
2
4
3
4
3
2
port 2A
port 4
2A
4