TB-9-2320-279-13-P-2

TECHNICAL BULLETIN; CREW PROTECTION KIT

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS (RPSTL)

SEPTEMBER 2005

  TB-9-2320-279-13-P-2 - Page 78 of 460

TB 9-2320-279-13&P-2
DOOR BALLISTIC GLASS AND FRAME ASSEMBLY REPLACEMENT - CONTINUED
0014 00
0014 00-6
INSTALLATION - CONTINUED
WARNING
Use caution when handling heavy parts. Provide adequate support and use assistance during procedure.
Keep clear of heavy parts supported only by lifting device. Failure to follow this warning may cause
injury or death to personnel.
For proper threat protection, door ballistic glass must be correctly installed into door frame. During
installation, ensure that stencil marking “INSIDE OF VEHICLE” is located on inside of cab. Improp-
erly installed door ballistic glass will not protect occupants. Failure to follow this warning may cause
injury or death to personnel.
NOTE
Door ballistic glass weighs 75 lb (34 kg).
12.
With assistance, install door ballistic glass (1) by sliding into end of channel (7).
NOTE
It may be necessary to cut bracket (8) approximately 0.5 in. (1.3 cm) to allow handle to rotate.
417-138
0.5 INCH
(1.3 CM)


Back to Top