TB-9-2320-279-13-P-2

TECHNICAL BULLETIN; CREW PROTECTION KIT

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS (RPSTL)

SEPTEMBER 2005

  TB-9-2320-279-13-P-2 - Page 82 of 460

Change 1
0014 01-2
TB 9-2320-279-13&P-2
DOOR BALLISTIC GLASS REPLACEMENT - MODEL B - CONTINUED
0014 01
REMOVAL - CONTINUED
2.
Remove four bolts (6), lockwashers (7), washers (8), and upper support (5) from ballistic glass cover (9). Discard lock-
washers.
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Failure to follow this warning may cause injury or death to personnel.
CAUTION
Use caution when handling ballistic glass. Protect surfaces when stored.
NOTE
Only loosen bolts enough to remove ballistic glass from lower support.
Mark outside surface before removal if re-installing ballistic glass.
3.
With assistance, loosen four bolts (11), remove ballistic glass (10) from lower support (14), and place glass on flat sur-
face.
4.
With assistance, remove four bolts (11), lockwashers (12), washers (13), ballistic glass cover (9), and lower support (14)
from door. Discard lockwashers.
5.
Remove 18 locknuts (20), bolts (18), washers (19), and two ballistic glass frames (21) from ballistic glass (10). Discard
locknuts.
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Failure to follow this warning may cause injury or death to personnel.
6.
With assistance, remove ballistic glass (10) from ballistic glass frame (4).
7.
Remove 10 nuts (15), washers (16), and rollers (17) from supports (5 and 14).


Back to Top