TB-9-2320-279-13-P-2

TECHNICAL BULLETIN; CREW PROTECTION KIT

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS (RPSTL)

SEPTEMBER 2005

  TB-9-2320-279-13-P-2 - Page 89 of 460

TB 9-2320-279-13&P-2
DOOR ASSEMBLY REPLACEMENT - CONTINUED
0015 00
0015 00-3
REMOVAL - CONTINUED
5.
Remove 10 locknuts (14), washers (15), and bolts (16) from door assembly (1). Discard locknuts.
6.
Use lifting device to remove door assembly (1) from door frame and place on flat surface.
7.
Remove sling and lifting device from door assembly (1).
8.
Remove two locknuts (12), washers (11), bolts (10), and lifting links (13). Discard locknuts.
CLEANING AND INSPECTION
Clean and inspect all parts IAW
General Maintenance Instructions
(WP 0011 00).


Back to Top