TB-9-2320-279-13-P-2

TECHNICAL BULLETIN; CREW PROTECTION KIT

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS (RPSTL)

SEPTEMBER 2005

  TB-9-2320-279-13-P-2 - Page 97 of 460

TB 9-2320-279-13&P-2
0016 00-1
DOOR LATCH ADJUSTMENT
0016 00
THIS WORK PACKAGE COVERS
Adjustment
INITIAL SETUP
Maintenance Level
Unit
Tools and Special Tools
Tool Kit, General Mechanic’s (Item 13, WP 0034
00)
Materials/Parts
Rag, Wiping (Item 7, WP 0035 00)
Locknut (4)
Equipment Conditions
Vehicle parked on level ground (TM 9-2320-279-
10)
Parking/Emergency Brake applied (TM 9-2320-
279-10)
Engine off (TM 9-2320-279-10)
If equipped, Battery Disconnect Switch in OFF
position (TM 9-2320-279-10)


Back to Top