TB-9-2320-279-13-P-2

TECHNICAL BULLETIN; CREW PROTECTION KIT

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS (RPSTL)

SEPTEMBER 2005

  TB-9-2320-279-13-P-2 - Page 93 of 460

TB 9-2320-279-13&P-2
0015 01-1
Change 1
DOOR ASSEMBLY REPLACEMENT - MODEL B
0015 01
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Maintenance Level
Unit
Tools and Special Tools
Tool Kit, General Mechanic’s (Item 13, WP 0034
00)
Shop Equipment, Common No. 1 (Item 10, WP
0034 00)
Sling, Nylon (Item 7, WP 0034 00)
Device, Lifting, 500-lb Capacity
Materials/Parts
Rag, Wiping (Item 7, WP 0035 00)
References
WP 0004 00
WP 0011 00
Personnel Required
Two
Equipment Conditions
Vehicle parked on level ground (TM 9-2320-279-
10)
Parking/Emergency Brake applied (TM 9-2320-
279-10)
Engine off (TM 9-2320-279-10)
Battery Disconnect Switch in OFF position (TM 9-
2320-279-10)
If installing new Door Assembly, remove Exterior
Mirror (TM 9-2320-279-20)
NOTE
The following procedure is for left door assembly. Use same procedure for right door assembly.


Back to Top