TB-9-2320-279-13-P-2

TECHNICAL BULLETIN; CREW PROTECTION KIT

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS (RPSTL)

SEPTEMBER 2005

  TB-9-2320-279-13-P-2 - Page 79 of 460

TB 9-2320-279-13&P-2
DOOR BALLISTIC GLASS AND FRAME ASSEMBLY REPLACEMENT - CONTINUED
0014 00
0014 00-7/(0014 00-8 Blank)
INSTALLATION - CONTINUED
13.
When door ballistic glass (1) is near center position, lower handle (2) into center lock hole and rotate handle outward.
14.
Lift handle (2) out of center lock hole and close door ballistic glass (1).
15.
Install spacer (4), bolt (3), washer (6), and new locknut (5) in bottom channel (7).
16.
Install washer (12), bolt (11), washer (10) and new locknut (9).
17.
Operate door ballistic glass (1) to verify correct operation.
END OF WORK PACKAGE