TB-9-2320-279-13-P-2

TECHNICAL BULLETIN; CREW PROTECTION KIT

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS (RPSTL)

SEPTEMBER 2005

  TB-9-2320-279-13-P-2 - Page 75 of 460

TB 9-2320-279-13&P-2
DOOR BALLISTIC GLASS AND FRAME ASSEMBLY REPLACEMENT - CONTINUED
0014 00
0014 00-3
REMOVAL - CONTINUED
3.
Pull handle (2) down and rotate toward hinge edge of door.
4.
Remove bolt (3), spacer (4), locknut (5), and washer (6) from bottom channel (7). Discard locknut.
WARNING
Use caution when handling heavy parts. Provide adequate support and use assistance during procedure.
Keep clear of heavy parts supported only by lifting device. Failure to follow this warning may cause injury
or death to personnel.
NOTE
Door ballistic glass weighs 75 lb (34 kg).
5.
With assistance, lift up on handle (2) and remove door ballistic glass (1) by sliding it out end of channel (7).


Back to Top