INSTALLATION – CONTINUED
9. Feed wiring harness (Figure 6, Item 8) through slider bed (Figure 6, Item 1) and install light (Figure 6, Item 6),
two ground wires (Figure 6, Item 5), and screws (Figure 6, Item 4) on slider bed.
10. Install light cover (Figure 6, Item 2) and two screws (Figure 6, Item 3) on light (Figure 6, Item 6).
11. Install new tiedown straps (Figure 6, Item 7) as required.
Figure 6.
Slider Bed Light Installation.
039
END OF TASK
FOLLOW-ON TASKS
00039
1. Install twistlock module (WP 0041).
2. Install clamping device (WP 0038).
3. Install front slider bed (WP 0038).
4. Install sensor (WP 0034).
END OF TASK