TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 574 of 704

TB 9-3950-253-13&P
Change 1
0052-64
0052
LIGHT BAR ASSEMBLY INSTALLATION – CONTINUED
32. Route wire extension (Figure 66, Item 1) along sensor harness (Figure 66, Item 2) and install new tiedown
straps (Figure 66, Item 3) as required.
Figure 66.
Tiedown Strap Installation.
052
NOTE
Install light covers in positions noted during removal.
Perform step 33 for seven light covers.
33. Install light cover (Figure 67, Item 1) and two screws (Figure 67, Item 2) on light (Figure 67, Item 3).
Figure 67.
Light Cover Installation.
052
1
2
3
1
2
3


Back to Top