TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 575 of 704

0052-65
Change 1
TB 9-3950-253-13&P
0052
LIGHT BAR ASSEMBLY INSTALLATION – CONTINUED
NOTE
Perform step 34 for reflectors on right and left sides of slider assembly.
34. Install reflector (Figure 68, Item 2) and two screws (Figure 68, Item 3) on slider assembly (Figure 68, Item 1).
Figure 68.
Reflector Installation.
052
Ground Wire Installation - HEMTT Only
00052
1. Route ground wire (Figure 69, Item 4) from wiring harness to right side of frame (Figure 69, Item 1) and install
ground wire, bolt (Figure 69, Item 2), and nut (Figure 69, Item 3) on frame.
2. Install tiedown straps (
Figure 69
, Item 5) as required.
Figure 69.
HEMTT Ground Wire Installation.
052
1
2
3
1
2,3
4
5


Back to Top