TM-3-1040-268-20-P

LAUNCHER, GRENADE, SMOKE: SCREENING, RP, M250

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

MAY 1982

  TM-3-1040-268-20-P - Page 44 of 72

TM 3-1040-268-20&P
2-8. DISCHARGERS - MAINTENANCE INSTRUCTIONS (CONT).
LOCATION
ITEM
ACTION
REMARKS
d. Ground Wire - Maintenance Instructions (Cont).
Discharger
Electrical circuits
Troubleshoot, using multimeter do step 3 under
malfunction 1 in table 2-1 (para 2-6).
NOTE
Do not paint electrical receptacle connector, jack connectors, nameplate, or screws. Do not let
paint clog mounting holes or drain holes.
Discharger
All outside surfaces
a. Remove burrs, corrosion, and chipped paint.
b. Touch up with primer coating (item 4, app D), See TM 43-0139.
and enamel (item 3, app D).
2-9. DISCHARGER COVERS - MAINTENANCE INSTRUCTIONS.
See Section II Service Upon Receipt.
Section VI. PREPARATION FOR STORAGE OR SHIPMENT
2-10. SECURITY PROCEDURES,
The launcher is a nonsensitive item and
2-12.
PRESERVATION MATERIALS. No
special preservation materials are
may be stored or shipped using standard storage and transportation handling
required for storage or shipment of the launcher.
procedures.
2-13. TYPE OF STORAGE.
Usually, the launcher will require only short term
2-11. PRESERVATION, PACKAGING, PACKING, MARKING, AND SHIP-
storage of 1 to 45 days before being installed on the combat vehicle. This
PING REQUIREMENTS.
Prior to being installed on the combat vehicle, the
equipment will be placed in administrative storage (TM 740-90-1) where it can
launcher will be stored in its original shipping container using the same preser-
be readied for mission performance within 24 hours. The administrative storage
vation and packing materials described in Section II, Service Upon Receipt.
site should protect the launcher from the elements and allow access for visual
inspection. No special storage facilities are needed.
2-32


Back to Top