TM 5-5420-202-20-3
ENGINE GENERATOR REPLACEMENT (Sheet 8 of 8)
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
Install electrical lead (CKT 1) (AA)
to terminal marked ”A” (AB).
Using 3/8 inch socket, install flat
washer and nut (AC).
Install electrical lead (CKT 478) (AD)
to terminal marked “D” (AE).
Using 3/8 inch socket, install
flat washer and nut (AF).
19.
20.
Using 1/2 inch socket, install
electrical lead (X) and screw and
new lockwasher (Y).
Using spanner wrench, install electrical
connector (Z).
Install cable (AG) and two electrical leads (AH) to terminal marked
“B” (AJ).
Using 9/16 inch socket, install flat washer and nut (AK).
Remove two wooden blocks from under generator (A).
Install air intake tube assembly (page 10-5).
Using ground hop kit, perform powerplant
test run (page 5-26).
Install powerplant (page 5-14).
End of Task
TA248954
10-13
Change 7
10-12.1