TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 554 of 1060

TM 5-5420-202-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 6 of 28)
15.
16.
17.
18.
19.
20.
21.
22.
23.
Using 9/16 inch wrench, install screw (R)
through link (U) and shifting rod bearing
end (T).
Holding rod bearing ends (T) and (X) with
9/16 inch wrench, use torque wrench and
9/16 inch crowfoot adapter to tighten jam-
nuts (P) and (Q) to 16-18 lb-ft (22-24 N·m).
Remove locating pin (L) from alinement holes in bracket (M) and link (N).
Using torque wrench and 9/16 inch socket, tighten screw (R) to 16-18 lb-ft (22-24 N·m)
and go to step 39.
Using 9/16 inch wrench, adjust shifting rod bearing end (T) clockwise until shifting rod (S)
is past hole (W).
Using 9/16 inch wrench, remove screw (Y).
Using 9/16 inch wrench, install screw (R) through link (U) and shifting rod bearing end (T).
Holding rod bearing end (T) with 9/16 inch wrench, use torque wrench and 9/16 inch
crow foot adapter to tighten jamnut (Q) to 16-18 lb-ft (22-24 N·m).
Using torque wrench and 9/16 inch socket, tighten screw (R) to 16-18 lb-ft (22-24 N·m).
Go on to sheet 7
TA249323
11-57


Back to Top