TM 5-5420-202-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 11 of 28)
49.
50.
51.
52.
53.
54.
55.
56.
57.
Using 9/16 inch wrench, adjust shifting rod
bearing end (AG) clockwise until shifting
rod (AH) is past hole (AJ).
Using 9/16 inch wrench, remove screw (AM).
Using 9/16 inch wrench, install screw (AF)
through clevis (AC) and shifting rod bearing
end (AG).
Holding rod bearing end (AG) with 9/16 inch
wrench, use torque wrench and 9/16 inch
crow foot adapter to tighten jamnut (AD) to
16-18 lb-ft (22-24 N·m).
Using torque wrench and 9/16 inch socket,
tighten screw (AF) to 16-18 lb-ft (22-24 N·m).
Using 9/16 inch wrench, adjust shifting rod bearing
counterclockwise until. screw (AM) will drop freely
bearing end (AL).
Using 9/16 inch wrench, install screw (AM).
end (AL) by turning clockwise or
through clevis (Z) and shifting rod
Holding rod bearing end (AL) with 9/16 inch wrench, use torque wrench and 9/16 inch
crow foot adapter to tighten jamnut (AE) to 16-18 lb-ft (22-24 N·m) and remove locating
pin (L).
Using torque wrench and 9/16 inch socket, tighten screw (AM) to 16-18 lb-ft (22-24 N·m)
and go on to step 68.
Go on to Sheet 12
TA249328
11-62