TM 5-5420-202-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 12 of 28)
58.
59.
60.
61.
62.
63.
64.
65.
66.
Using 9/16 inch wrench, remove screw (AM).
Using 9/16 inch wrench, adjust shifting
rod bearing end (AL) by turning clockwise
until shifting rod (AH) is past hole (AK).
Using 9/16 inch wrench, install screw (AM).
Holding rod bearing end (AL) with 9/16 inch
wrench, use torque wrench and 9/16 inch crow-
foot adapter to tighten jamnut (AE) to 16-18
lb-ft (22-24 N·m).
Using torque wrench and 9/16 inch socket,
tighten screw (AM) to 16-18 lb-ft (22-24 N·m).
Using 9/16 inch wrench, adjust shifting rod
bearing end (AG) by turning clockwise or
counterclockwise until screw (AF) will drop
freely through clevis (AC) and shifting rod
bearing end (AG).
Using 9/16 inch wrench, install screw (AF).
Holding rod, bearing end (AG) with 9/16 inch wrench, use torque wrench and 9/16 inch
crowfoot adapter to tighten jamnut (AD) to 16-18 lb-ft (22-24 N·m).
Using torque wrench and 9/16 inch socket, tighten screw (AF).
Go on to Sheet 13
TA249329
11-63