TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 568 of 1060

TM 5-5420-202-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 20 of 28)
103.
104.
105.
106.
Using 9/16 inch wrench, remove two screws (BJ).
Using fingers remove stud and rod end bearing
assembly (BK).
Using 6 inch rule, measure center to center
distance between rod end holes. If measure-
ment is 5-3/4 inches, assembly is in adjust-
ment and go to step 120. If measurement is
not 5-3/4 inches, go on to step 106.
Using vise and 9/16 inch wrench, loosen
jamnut (BL).
107.
Using vise and 9/16 inch wrench, turn rod
bearing end (BM) clockwise or counter-
clockwise until distance between centers
of rod bearing ends (BM) and (BN) measures
5-3/4 inches.
108.
Using small diameter wire, check to see if rod (BP) is past holes (BQ) and (BR). If rod (BP)
is past holes (BQ) and (BR), go on to step 109. If rod (BP) is not past hole (BQ), do steps
110 thru 114. If rod (BP) is not past hole (BR), go on to step 115.
109.
Using vise, torque wrench, and 9/16 inch crowfoot adapter, tighten jamnut (BL) to
16-18 lb-ft (22-24 N·m) while maintaining 5-3/4 inch measurement. Go on to step 120.
Go on to Sheet 21
TA249337
11-71


Back to Top