TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 571 of 1060

page 5-14
TM 5-5420-202-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 23 of 28)
122.
Using hands position shield (AT)
and seal assembly (AS).
123.
Using 7/16 inch socket install five screws
(AP), two flat washers (AR), and five lock-
washers (AQ) to secure seal assembly (AS)
and shield (AT).
Go on to Sheet 24
125.
At top of transmission, try to insert
locating pin in alinement hole (C) and
through link (AN). If locating pin can
be inserted, go on to step 126. If locating
pin cannot be inserted go to step 127.
TA249340
11-74


Back to Top