TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 570 of 1060

TM 5-5420-202-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 22 of 28)
115.
Using vise and 9/16 inch wrench, loosen
jamnut (BS).
116 .
Using 9/16 inch wrench, turn rod bearing
end (BN) clockwise until rod (BP) is past
hole (BR).
117.
118.
Using vise, torque wrench, and 9/16 inch crowfoot adapter, tighten jamnut (BS) to 16-18
lb-ft (22-24 N·m).
Using 9/16 inch wrench, turn rod bearing end (BM) clockwise or counterclockwise until
distance between centers of rod bearing ends (BM) and (BN) measures 5-3/4 inches.
Go on to Sheet 23
119.
Using vise, torque
crowfoot adapter,
wrench, and 9/16 inch
tighten jamnut (BL) to
16-18 lb-ft (22-24 N·m) while maintaining
5-3/4 inch measurement.
120.
Using fingers install stud and rod end
bearing assembly (BK).
121.
Using 9/16 inch wrench, install two
screws (BJ).
TA249339
11-73


Back to Top