TM 5-5420-228-24
RESERVOIR QUADRANT REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
P
r
o
c
e
d
u
r
e
s
P
a
g
e
Removal
4-92
Cleaning
4-94
Installation
4-94
TOOLS:
1-5/16 in. socket with 3/4 in. drive
3/4 in. socket with 1/2 in. drive
7/16 in. socket with 1/2 in. drive
Ratchet with 3/4 in. drive
Ratchet with 1/2 in. drive
15 in. adjustable wrench
Putty knife
Lifting device (capable of lifting 500 lbs)
Sling
SUPPLIES:
Sealing compound (Item 13, Appendix D)
Pipe tape (Item 19, Appendix D)
Rags (Item 12, Appendix D)
Dry cleaning solvent (Item 15, Appendix D)
Lockwasher
Star washer (2 required)
Gloves (Item 27, Appendix D)
PERSONNEL: Three
REFERENCE: TM-10
PRELIMINARY PROCEDURE:
Remove air filter (page 3-258)
Remove oil strainer (page 3-257)
Remove ventilator blower (page 3-2)
Remove water can storage bracket (page 3-47)
Remove accessories control box (page 3-7)
Drain hydraulic reservoir (page 3-74)
Remove drain valve (page 3-219)
Remove master relief valve RV1 (page 3-90)
Remove pump relief check valve CV5 (page 3-120)
Remove reservoir return check valve CV8 (page 3-118)
Remove hydraulic fluid filter assembly (page 3-208)
Go on to Sheet 2
All data on pages 4-77 thru 4-91 deleted.
(4-91 blank)/4-92
Change 3