TM-9-2320-272-23-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 3 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-3 - Page 1366 of 1469

INSTALLATION
1.
Install bushing (Figure 3, Item 3) in spring eye (Figure 3, Item 9).
2.
Align spring eye (Figure 3, Item 9) with holes in shackle (Figure 3, Item 2).
3.
Install pin (Figure 3, Item 7) in shackle (Figure 3, Item 2) and spring eye (Figure 3, Item 9). Make sure pin slot
(Figure 3, Item 6) is positioned downward to allow installation of screw (Figure 3, Item 5).
4.
Install grease fitting (Figure 3, Item 8) in pin (Figure 3, Item 7).
5.
Install screw (Figure 3, Item 5) and locknut (Figure 3, Item 4) in shackle (Figure 3, Item 2).
6.
Remove jackstands (Figure 3, Item 10) from frame (Figure 3, Item 1).
9
M0443DAA
8
7
5
4
3
2
1
6
10
Figure 3.
Front Spring Bushing Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Lubricate shackle. (Volume 5, WP
0820)
2.
Install front wheels. (WP
0484)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-3
0536
0536-3/4 blank


Back to Top