TM-9-2320-272-23-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 3 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-3 - Page 265 of 1469

INSTALLATION
1.
Install bracket (Figure 4, Item 3) on body (Figure 4, Item 2) with two screws (Figure 4, Item 14).
2.
Install valve (Figure 4, Item 4) on bracket (Figure 4, Item 3) with two screws (Figure 4, Item 5) and locknuts
(Figure 4, Item 12).
NOTE
Male pipe threads must be wrapped with antiseize tape before installation.
3.
Install elbow (Figure 4, Item 6) and adapter (Figure 4, Item 8) on valve (Figure 4, Item 4).
4.
Install breather (Figure 4, Item 7) on adapter (Figure 4, Item 8).
5.
Install clevis (Figure 4, Item 10) on rod (Figure 4, Item 19).
6.
Install clevis (Figure 4, Item 10) on valve (Figure 4, Item 4) with pin (Figure 4, Item 9), washer
(Figure
4,
Item
11), and cotter pin (Figure 4, Item 13).
7.
Install rod (Figure 4, Item 19) on lever (Figure 4, Item 1) with washer (Figure 4, Item 20) and cotter pin
(Figure
4,
Item
18).
8.
Install adapters (Figure 4, Items 15 and 23) on valves (Figure 4, Items 4 and 22).
9.
Install hose (Figure 4, Item 16) on adapters (Figure 4, Items 15 and 23).
10.
Install two tiedown straps (Figure 4, Item 17) on hoses (Figure 4, Items 16 and 21).
22
23
16
4
3
5
7
8
6
9
10
11
13
12
14
1
21
20
18
16
15
19
17
M9959DAA
2
Figure 4.
Governor Piping Installation.
TM 9-2320-272-23-3
0367
0367-6


Back to Top