TM-9-2320-272-23-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 3 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-3 - Page 272 of 1469

INSTALLATION
1.
Install pressure switch (Figure 2, Item 2) on tee (Figure 2, Item 1).
2.
Connect two capacitor leads (Figure 2, Item 3) to pressure switch (Figure 2, Item 2).
3
1
2
M8069DAA
Figure 2.
Pressure Switch Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
Connect battery ground cable. (Volume 2, WP
0350)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-3
0368
0368-3/4 blank


Back to Top