TM-9-2320-272-23-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 3 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-3 - Page 259 of 1469

INSTALLATION
1.
Install neutral start switch (Figure 2, Item 4) on left side of transmission (Figure 2, Item 1). Do not overtighten.
2.
Connect wires (Figure 2, Items 5 and 6) to neutral start switch (Figure 2, Item 4).
3.
Install retainer shift linkage (Figure 2, Item 3) on left side of transmission (Figure 2, Item 1) with nut
(Figure
2,
Item 2).
4
5
2
1
6
3
M0224DAA
Figure 2.
Transmission Neutral Start Switch Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Connect battery ground cables. (Volume 2, WP
0350)
2.
Check operation of neutral start switch. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-3
0366
0366-2


Back to Top