TM-9-2320-272-23-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 3 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-3 - Page 72 of 1469

INSTALLATION - Continued
5
3
2
1
10
9
8
7
6
M8038DAA
4
14
11
12
13
3
9
Figure 2.
Slave Receptacle Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
Install battery ground cables. (Volume 2, WP
0350)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-3
0353
0353-5/6 blank


Back to Top