INSTALLATION
1.
Install fresh air control handle (Figure 3, Item 5) and fresh air control cable (Figure 3, Item 4) through hole in
instrument cluster (Figure 3, Item 6).
2.
Position fresh air control handle (Figure 3, Item 5) against instrument cluster (Figure 3, Item 6) and install with
lockwasher (Figure 3, Item 3) and nut (Figure 3, Item 2).
3.
Install instrument cluster (Figure 3, Item 6) on instrument panel (Figure 3, Item 1) with eight screws
(Figure 3, Item 7).
4.
Push fresh air control handle (Figure 3, Item 5) in all the way.
5.
Push fresh air control cable (Figure 4, Item 2) through firewall (Figure 4, Item 5).
7
6
5
4
3
2
1
M5171DAA
Figure 3.
Fresh Air Vent Control Assembly Installation.
TM 9-2320-272-23-4
0741
0741-3