REMOVAL - Continued
WARNING
All personnel must stand clear during lifting operations. A snapped chain, or shifting or
swinging load, may result in injury to personnel. Failure to comply may result in injury or death
to personnel.
NOTE
Mechanic will handle one guide line and direct hoisting operation. Assistant will handle other
guide line. Second assistant will operate lifting device.
12.
Lift dump body (Figure 1, Item 1) clear of subframe (Figure 1, Item 7) and place on shop stands.
13.
Remove six screws (Figure 1, Item 8) from dump body (Figure 1, Item 1).
14.
Remove guide lines, lifting device, and utility chains from dump body (Figure 1, Item 1).
5
6
7
M3010DAA
3
4
1
8
9
10
11
14
15
2
13
12
15
1
2
Figure 1.
Dump Body Removal.
END OF TASK
TM 9-2320-272-23-4
0594
0594-3