INSTALLATION - Continued
9.
Install control valve cover (Figure 14, Item 2) on gondola (Figure 14, Item 3) with five screws
(Figure
14,
Item
1).
M6080DAA
3
2
1
Figure 14.
Crane Gondola Control Valve Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Fill hydraulic oil reservoir to proper oil level. (Volume 5, WP
0820)
2.
Check pressure relief valve adjustment. (WP
0705)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-4
0698
0698-17/18 blank