INSTALLATION
1.
Attach two utility chains to gondola (Figure 3, Item 5).
2.
Attach lifting device to two utility chains.
NOTE
•
Assistant will help with Step (3).
•
When positioning gondola, guide all hydraulic lines through opening.
3.
Lift gondola (Figure 3, Item 5) to turntable side plate (Figure 3, Item 2) and install with 12 screws
(Figure
3,
Item
4) and locknuts (Figure 3, Item 3). Tighten screws 44 to 61 lb-ft (60
to
83
N·m).
4.
Remove two utility chains and hoist hook from gondola (Figure 3, Item 5).
5.
Install gondola guard (Figure 3, Item 1) on gondola (Figure 3, Item 5).
M6088DAA
6
7
5
4
3
2
1
Figure 3.
Gondola Installation.
TM 9-2320-272-23-4
0699
0699-5