TM-9-2320-328-13-P-1

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 1 OF 3

MARCH 2009

  TM-9-2320-328-13-P-1 - Page 833 of 1318

TM 9-2320-328-13&P-1
0075-11
DRAFT
0075
HWT0448
Step 10.
Connect valve control wire harness connector to tank fill & re-circulating line valve
motor.
Disconnect valve control wire harness connectors from DRIVER SIDE AUX.
INLET valve control.
Connect tank fill & re-circulating line valve control wire harness
connector to DRIVER SIDE AUX. INLET valve control.
Push battery disconnect switch
to on position (WP 0007).
While an assistant pushes pump operator’s panel DRIVER
SIDE AUX. INLET valve control OPEN and CLOSE buttons (WP 0004), check if tank fill
& re-circulating line valve operates.
a.
If tank fill & re-circulating line valve operates, reconnect valve control
wire harness connectors to original positions and replace TANK FILL &
RE-CIRCULATING LINE valve control (WP 0209).
b.
If tank fill & re-circulating line valve does not operate, reconnect valve
control wire harness connectors to original positions and replace tank
fill & re-circulating line valve motor (WP 0248).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION


Back to Top