TM 9-2320-328-13&P-1
0075-15/(16 blank)
DRAFT
0075
END OF TASK
FOLLOW-ON MAINTENANCE
Remove wheel chocks (TM 9-2320-422-10)
END OF TASK
END OF WORK PACKAGE
HWT0452A
Step 15.
Disconnect pump house wire harness pump house power distribution wire harness
connector DP2.
With a test lead set, check for 22 to 28 VDC between pump house
power distribution wire harness wire 4083 (green) at connector DP2, terminal D and a
known good ground.
a.
If 22 to 28 VDC are present, repair wire 4083 in pump house wire
harness if repairable
(TM 9-2320-325-14&P), or replace pump house
wire harness (WP 0302).
b.
If 22 to 28 VDC are not present, repair wire 4083 in pump house power
distribution wire harness if repairable (TM 9-2320-325-14&P), or
replace pump house power distribution wire harness and
block (WP 0299).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION