TM 9-2320-328-13&P-2
0310-4
DRAFT
0310
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
6.
Install fuel line (2) on tube (3) and tighten clamp (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Install pump house on panels K, G, and E (WP 0339)
END OF TASK
END OF WORK PACKAGE
HWT1553