TM 9-2320-328-13&P-2
0146-2
DRAFT
0146
INSTALLATION
Lightly lubricate preformed packing (2) with clean oil, and install preformed packing (2) and fluid level gauge (1) on
hydraulic reservoir (3).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump house panel K access door (WP 0008)
2.
Remove wheel chocks (TM 9-2320-422-10)
END OF TASK
END OF WORK PACKAGE
HWT2784