PREPARE CRANE FOR USE - Continued
TRAILER
AIR SUPLY
UST
4
3
1
2
Figure 1.
6.
Set PTO ENGAGE switch (3) to OFF position. Indicator light (4) will go out.
CAUTION
PTO ENGAGE switch must be in OFF position before moving hydraulic
selector valve control to prevent equipment damage.
7.
Push hydraulic selector valve control (5) in for crane operation.
TM 9-2320-428-10
0042
0042-3