TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 1099 of 1616

TM 9-2320-440-13&P
0154-3
0154
TRANSVERSE BEAM BUSHING REMOVAL
WARNING
Use of press of 10,000 lbs (4,540 kg) capacity or greater is required to remove or
install bushings on transverse beams. Use care when pressing bushings to prevent
injury or death to personnel. Always wear eye protection to prevent injury when
operating press.
NOTE
Bushings are removed from both transverse beams the same way.
1.
Press two end bushings (1) out of transverse beam (2).
END OF TASK
CLEANING/INSPECTION
1.
Clean all metal parts with solvent cleaning compound.
2.
Clean transverse beam bores with emery cloth or cylinder hone to remove all corrosion.
3.
Inspect transverse beam for cracks and damage.
4.
Replace transverse beam if cracked or damaged.
END OF TASK
TRANSVERSE BEAM BUSHING INSTALLATION
NOTE
Bushings are installed on both transverse beams the same way.
1.
Lubricate two end bushings (1) with soap solution.
WARNING
Use of a press of 10,000 lbs (4,540 kg) capacity or greater is required to remove or
install bushings on transverse beams. Use care when pressing bushings to prevent
injury or death to personnel. Always wear eye protection to prevent injury when
operating press.
2.
Press two end bushings (1) into transverse beam (2) so end bushings (1) extend equally from both sides of
transverse beam (2).
END OF TASK
THAAD0371


Back to Top