TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 99 of 1616

TM 9-2320-440-13&P
0015-1
0015
OPERATOR MAINTENANCE
OPERATE VEHICLE IN EXTREME COLD ENVIRONMENT (-26ºF [-32ºC] TO -50ºF [-46ºC])
Before operating LHS, perform warm-up as follows:
NOTE
For arctic kit installation instructions, refer to TM 9-2320-325-14&P.
1.
Start engine (
2.
With engine running at smooth idle, move PTO ENGAGE switch (1) to ON position. Indicator light (2) is
illuminated.
3.
Allow engine to operate at idle for five minutes. LHS is ready for operations at idle.
4.
Turn hydraulic selector switch (3) to AUTO position.
5.
If MRP is loaded, position LHS cab control joystick (4) to LOAD (5) position for five minutes.
6.
If LHS is to be used to load, function LHS one complete cycle (WP 0011) before operating at high idle.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
-
-
THAAD0474


Back to Top