TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 305 of 1348

CONDITION/INDICATION
Does test equipment pass offset test?
DECISION
Yes - Go to (Step 4 - Does quick disconnect check valve allow 125 ± 5 psi (861 ± 34 kPa) to pass through hose
2229?).
No - Test equipment failed offset. Contact your Supervisor.
STEP 4
Does quick disconnect check valve allow 125 ± 5 psi (861 ± 34 kPa) to pass through hose 2229?
WARNING
If air lines are disconnected when they are under 125 ±5 psi (862 ±34 kPa) pressure,
they can whip around. Be sure to wear eye protection and exercise care when
disconnecting an air hose that is thought to be under pressure. Failure to comply may
result in injury or death to personnel.
Remain clear of drawbar when it is raised. Failure to comply may result in injury or
death to personnel.
1.
Start engine. Refer to vehicle Operator's manual (WP
0190).
2.
Perform ICE Test 50.
AIRLINE
2229
TRANSDUCER
NO. 1 AIR
RESERVOIR
Figure 4.
Air Reservoir and Air Line 2229.
3.
Have assistant push in trailer charge valve in vehicle. Refer to vehicle Operator's manual (WP
0190).
4.
Observe meter reading.
5.
Meter should display 125 ± 5 psi (861 ± 34 kPa).
TM 9-2330-342-23&P
0028
0028-5


Back to Top