TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 431 of 1348

FIELD MAINTENANCE
FIELD LEVEL PMCS - SEMI-ANNUAL
INITIAL SETUP:
Tools and Special Tools
Gun, Grease (Refer to vehicle Operator's manual)
(WP
0190)
Tool Kit, General Mechanic’s: Automotive
(WP
0194, Table 1, Item 47)
Materials/Parts
Grease, Automotive and Artillery (GAA)
(WP
0193, Table 1, Item 33, 34, 35, 36, 37)
Oil, Lubricating (WP
0193, Table 1, Item 44, 45,
46)
References
TM 9-2330-342-10
(WP
0190)
References (cont.)
WP
0067
WP
0072
WP
0082
WP
0094
WP
0097
WP
0102
WP
0106
Table
1.
FIELD LEVEL PMCS - SEMI-ANNUAL.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
1
Semi-
Annual
Cross-Members
and Frame
Inspect crossmembers (Figure 1, Item 2) and frame
(Figure 1, Item 1) for cracks in welds. If cracks are found,
notify supervisor.
Crossmembers or frame
have cracks in welds.
1
2
Figure 1.
Field Level PMCS Semi-Annual.
TM 9-2330-342-23&P
0047
0047-1


Back to Top